No date.
Tag: Ainslie Archive Box 2
-
-
English Text, ‘Lot 1 Repair air conditioning system.’
No date.
-
‘English Text, Keeping in combat readiness and repair water systems.’
No date.
-
‘English Text, Informkarta 2 Samples.’
No date.
-
‘English Text, Chehov, Chehov.ru Forum posts.’
August 2010.
-
‘Russian Text, Appendix No.6 to the tender documents, METHODOLOGY OF MODERNIZATION OF PRODUCT SWITCHING CENTERS 65c30 BY IMPLEMENTING THE PRODUCT 83T099 INTI OPERATION.’
No date.
-
‘Russian Text, Appendix No.5 to the tender documentation, PRODUCT CONTROL POINT 65C30, PROCEDURE FOR COMMISSIONING.’
No date.
-
‘Russian Text, Andreeva, Office of the state order of the Ministry of Defence of the Russian Federation.’
February 2009.
-
‘Appendix No.5, to the tender documentation. METHOD OF ENTRY POINT OF THE PRODUCT FOR USE 65S30.’
No date.
-
‘Annex No.6, to the tender documentation. METHOD FOR UPGRADING PRODUCTS 65s30 switching centre by introducing operation of the product 83t099.’
No date.
-
United States Department of Energy, Lawrence Livermore National Laboratory, C. Poppe, E. Vergino, B. Barker, P. Brown, T.J. Gilmartin, M.Nach, L. Sloss, ‘Whither Deterrence? A Brief Synopsis.’
May 2002.
-
S.J Lukasik, W.C Yengst, Nuclear weapons crisis and conflict situations, ‘UNCLASSIFIED: SECTION 1.0, EXECUTIVE SUMMARY.’
No date.