July 2010.
Tag: Ainslie Archive
-
-
‘Russian Text, Keeping in combat readiness and repair water systems.’
No date.
-
‘Russian Text, Compliance with Moscow, Measurement and specification of cable lines.’
2010.
-
‘Russian Text, Chehov.ru Forum posts.’
August 2010
-
‘Russian Text, Appendix to the Contract Terms of Reference, Maintaining combat readiness and repair of ventilation air conditioning.’
No date.
-
‘English Text, Repair of air conditioning and ventilation.’
No date.
-
English Text, ‘Lot 1 Repair air conditioning system.’
No date.
-
‘English Text, Keeping in combat readiness and repair water systems.’
No date.
-
‘English Text, Informkarta 2 Samples.’
No date.
-
‘English Text, Chehov, Chehov.ru Forum posts.’
August 2010.
-
‘Russian Text, Appendix No.6 to the tender documents, METHODOLOGY OF MODERNIZATION OF PRODUCT SWITCHING CENTERS 65c30 BY IMPLEMENTING THE PRODUCT 83T099 INTI OPERATION.’
No date.
-
‘Russian Text, Appendix No.5 to the tender documentation, PRODUCT CONTROL POINT 65C30, PROCEDURE FOR COMMISSIONING.’
No date.