In response to FOI request by Rob Evans, Defence Procurement Agency provided the UK Trident RBA Procurement Plan Vol. 13 Technical Control Plan Issue 7 dated Dec 1997. It is part of 13 inter-related volumes of publications the deal with management, cost, logistics, safety, performance requirements, environment etc. Part 1 of the document included design freeze, configuration control and post freeze review of the Trident procurement. Part 2 is about non-conformance reporting. Part 3 deals with nuclear ordnance record.
Tag: Nuclear weapons design
-
-
Scotsman, Severin Carrell, Massive rise in Trident costs
19 March 1992
-
US Department of Defense, ‘Sandia design of a warhead, The DoD Nuclear Weapon Systems Sustainment Programs.’
2000.
-
US Government, ‘Pantex Plant Final EIS, Figure 1.2.2-1 Nuclear Weapons Design.’
No date.
-
Nuclear Weapons Archive, ‘H-Bomb Diagram.’
2005.
-
Daily Telegraph, Francis Harris, ‘West’s submarine nuclear warheads flawed, say scientists.’
04 April 2005.
-
US Government, Sandia Lab News, ‘Lab Accomplishments 2002, Page 2: Nuclear Weapons.’
2002.
-
US Nuclear Warheads, Presentation slides, Technical details ‘FY01 Projects.’
No date.
-
‘The Designers, At the workbench’, Bulletin of the Atomic Scientists
July 2007
-
Cartage.org, ‘Fusion Weapon Physics, Nuclear Weapon Physics and Design’
08 January 2008
-
‘Introduction to Nuclear Weapon Physics and Design, Nuclear Weapon FAQ’, Carey Sublette
05 January 2005
-
Ainslie notes (?). Two stage thermonuclear weapons, ‘Interstage.’
No date.