In response to FOI request by Rob Evans, Defence Procurement Agency provided the UK Trident RBA Procurement Plan Vol. 13 Technical Control Plan Issue 7 dated Dec 1997. It is part of 13 inter-related volumes of publications the deal with management, cost, logistics, safety, performance requirements, environment etc. Part 1 of the document included design freeze, configuration control and post freeze review of the Trident procurement. Part 2 is about non-conformance reporting. Part 3 deals with nuclear ordnance record.
Tag: Weapons procurement
-
-
An alternative future for the Scottish shipbuilding and aerospace industries
By John Ainslie Download if the embedded viewer has a problem
-
US Navy, ‘Other procurement, Ordnance support.’
February 2006.
-
US Navy, ‘Weapons procurement, Ballistic missiles.’
February 2006.
-
Commerce Business Daily, ‘U.S. Government Procurements.’
06 June 1997.
-
US Government, ‘Exhibit P-10, Advance Procurement Requirements Analysis: Funding and Budget Justification.’
February 2003.
-
Naval Surface Warfare Center, ‘Supplies, equipment and material.’
20 May 1998.
-
Naval Surface Warfare Center, ‘Supplies, equipment and material.’
25 March 2004.
-
US Government ‘Procurements, Trident Fire Control.’
02 April 1997.
-
US Government ‘Procurements, Services, Trident Fire Control.’
17 April 1998.
-
US Navy, ‘Concept advanced design, Navsea tech authority.’
February 2008.
-
US Navy, ‘Weapons Procurement, Trident II.’
February 2006.